Charel Terrace Stormwater System Improvements

Project Description

The Charel Terrace Stormwater System Improvement Project is located on Birch Point off Semiahmoo Drive and was identified as a priority capital project in the Birch Bay Comprehensive Stormwater Plan. This project replaced failing stormwater facilities and added new facilities along Charel Drive and Cary Lane. Project components include: water treatment swales on Charel Drive, 600 feet of new pipe, and a new outfall structure to protect the shoreline.

Project Goals

  • Reduce flooding
  • Improve water quality
  • Increase stormwater flow capacity
  • Improve maintenance access


Construction Year: 2011- Completed

Engineer: Land Development Engineering & Surveying, Inc.

Contractor: Len Honcoop Gravel, Inc.

Construction Contract: $270,000